A large structural crack was discovered in the south-east corner of the chancel.
In order to fix it, three 2 metre long steel anchors were inserted in to the wall using a special structural reinforcement anchoring system.
The anchors are concealed behind face stone and the crack has been re-bedded in lime mortar.